Tariff Orders

Filter on   

S. No. Petition No Party Name Subject Order Date View
1 1485/19 RVUNL Approval of APR for FY 2013-14 to FY 2017-18 for RGTPP Stage-III (160 MW) 21/10/2019
2 1458/19 RVUNL Seeking in principle approval of additional capitalization at Kota Super Thermal Power Station (Unit 1 to 7) 22/08/2019
3 1441/2018 RVUNL True up of ARR for FY 2017-18 05/08/2019
4 1442/2018 Giral Lignite Power Ltd. True-up of ARR for Units 1 and 2 for FY 2017-18 30/07/2019
5 1439/2018 RVUNL Approval of provisional Capital Cost, ARR and Tariff for Chhabra Super Critical Tharmal Power Plant Unit 5 and 6 for FY 2018-19 30/07/2019
6 1478/19 RVUNL Review of Commission’s order dated 08.03.2019 issued in the matter of determination of final capital cost, ARR and Tariff for CTPP Unit 3 and 4 for FY 13-14 to 18-19 03/07/2019
7 966/16 (I.A. No. 13 of 2018) M/s Barmer Lignite Mining Company Ltd. Determination of Transfer Price of Lignite for FY 2017-18 from Kapurdi and Jalipa mines 24/06/2019
8 1286/17 M/s JSW Energy (Barmer) Ltd. Determination of ARR and tariff for FY 2018-19 13/06/2019
9 1286/17 (I.A. No. 1 of 2019) M/s JSW Energy (Barmer) Ltd. Interim tariff for FY 2019-20 01/05/2019
10 1439/18 (I.A. No. 3 of 2019) RVUNL Interim tariff for CTPP Unit 5 and 6 for FY 2019-20 01/05/2019
11 1334/18 RVUNL Determination of final Capital cost and ARR for FY 2013-14 to FY 2018-19 for Chhabra Thermal Power Project Unit-3 and 4 08/03/2019
12 - Suo-Motu Determination of generic tariff Biomass based power plants for FY 2018-19 08/03/2019
13 1404/18 Ajmer Vidyut Vitran Nigam Ltd. Determination of pooled cost of power purchase for FY 2018-19 08/03/2019
14 1414/18 Jaipur Vidyut Vitran Nigam Ltd. Determination of pooled cost of power purchase for FY 2018-19 08/03/2019
15 1365/18 Sh. B.M. Sanadhya Review of Commission’s order dated 28.05.2018 07/03/2019
16 1402/18 Jodhpur Vidyut Vitran Nigam Ltd. Determination of pooled cost of power purchase for FY 2018-19 22/02/2019
17 1340/18 RVUNL Approval of final capital cost and ARR and Tariff for FY 2013-14 to FY 2018-19 for RGTPP Stage III (160 MW) 31/01/2019
18 1352/18 RVPN Review of Commission’s order dated 03.05.2018 24/01/2019
19 1439/18 RVUNL Determination of ARR and Provisional Tariff for FY 2018-19 for CSTPS Stage II (unit 5 and 6) 04/01/2019
20 1361/18 JVVNL Review of Commissions order dt. 28.05.2018 12/10/2018
21 1364/18 JVVNL Approval of Additional Investment Plan for FY 2018-19 05/10/2018
22 1357/18 RVUN Review of Commission’s Order dt. 18.05.2018 26/09/2018
23 1359/18 GLPL Review of Commission’s Order dt. 28.05.2018 26/09/2018
24 1285/17 1286/17 RWPL BLMCL I.A. No. 7 and 8 26/09/2018
25 1310/18 GLPL Determination of ARR and Tariff for FY 2018-19 and true up for FY 2014-15 to FY 2016-17 for GLTPP Units 1 and 2 28/05/2018
26 1294/17 1295/17 1296/17 Discoms Approval of ARR and Tariff for FY 18-19 28/05/2018
27 1291/17 1292/17 1293/17 Discoms Approval of true up of ARR for FY 2016-17 28/05/2018
28 1288/17 1289/17 1290/17 Discoms Approval of Investment Plan for FY 2018-19 28/05/2018
29 1195/17 1221/17 M/s Jindal Urban Waste Management Ltd. Determination of project specific tariff for Municipal Solid Waste to Energy plants. 18/05/2018
30 1316/18 RVUN Determination of ARR and tariff for FY 2018-19 and approval of True-up of ARR for FY 2016-17 18/05/2018
31 967/16 RWPL Determination of ARR and tariff for FY 2017-18. 18/05/2018
32 1285/17 1286/17 RWPL BLMCL Interim tariff for FY 2018-19 10/05/2018
33 1316/18 RVUN Interim tariff for FY 2018-19 03/05/2018
34 1310/18 GLPL Interim tariff for FY 2018-19 03/05/2018
35 1284/17 1309/17 RVPN Approval of Investment Plan and determination of ARR and tariff for recovery of Transmission and SLDC Charges for FY 2018-19 and True up of ARR for FY 2016-17 of RVPN. 03/05/2018
36 I.A. 09 of 2017 in 966/16 BLMCL Application seeking amendment in petition 966/16 filed for determination of transfer price of lignite from Kapurdi mine for FY 2017-18 05/04/2018
37 1080/17 GLPL Approval of truing up of Unit 1 from FY 2011-12 to FY 2013-14 and of Unit 2 from FY 2010-11 to FY 2013-14 and ARR and Tariff Determination for Unit-1and 2 for FY 2017-18 04/04/2018
38 1105/17 RVUN determination of provisional Capital Cost, Aggregate Revenue Requirement and provisional Tariff for Unit 5(1x660 MW) of Chhabra Thermal Power Project (2x660 MW) Stage-II for FY 2017-18 04/04/2018
39 1100/17 M/s Rajasthan State Ganganagar Sugar Mills Ltd Determination of tariff for Baggase based co-generation power plant. 25/01/2018
40 1287/17 JVVNL Determination of pooled cost of power purchase for FY 2017-18 24/01/2018
41 1273/17 AVVNL Determination of pooled cost of power purchase for FY 2017-18 24/01/2018
42 1272/17 JdVVNL Determination of pooled cost of power purchase for FY 2017-18 24/01/2018
43 - Suo-Motu determination of generic tariff for biomass, biogas and biomass gasifier based power plants 28/11/2017
44 1076/17, 1077/17 and 1078/17 JVVNL, AVVNL and JdVVNL Approval of ARR and Tariff Petitions for FY 2016-17 and 2017-18 02/11/2017
45 - Suo-Motu Determination of benchmark capital cost for Solar PV and Thermal power projects applicable during FY 2017-18 and generic levelisied tariff 09/10/2017
46 986,987,990,991,999,1000/17 JVVNL, AVVNL, JdVVNL True-up of ARR for FY 2014-15 and 2015-16 05/10/2017
47 992-993, 988-989, 1001-1002/16 JVVNL, AVVNL and JdVVNL Approval of Investment Plan for FY 2016-17 and 2017-18 06/09/2017
48 1222/17 RWPL Review of Commission’s Order dated 19.06.2017 04/09/2017
49 - Suo-Motu Generic tariff for sale of electricity from wind power plants getting commissioned during FY 2017-18 10/07/2017
50 1035/17 RVUN Determination of ARR and tariff For FY 2017-18 and approval of True-up of ARR for FY 2014-15 and 2015-16 20/06/2017
51 816/16 RWPL Determination of ARR and Tariff for FY 2014-15, FY 2015-16 and FY 2016-17 19/06/2017
52 1059/17 and 1079/17 RVPN Approval of Investment Plan and determination of ARR and tariff for FY 2017-18 and True up of ARR for FY 2015-16 26/05/2017
53 1106/17 JVVNL Determination of pooled cost of power purchase for FY 2016-17 17/05/2017
54 1060/17 JdVVNL Determination of pooled cost of power purchase for FY 2016-17 17/05/2017
55 1082/17 AVVNL Determination of pooled cost of power purchase for FY 2016-17 17/05/2017
56 966/16 967/16 RWPL BLMCL Interim tariff for FY 2017-18 27/04/2017
57 1035/17 RVUN Interim tariff for FY 2017-18 07/04/2017
58 1079/17 RVPN Interim tariff for FY 2017-18 07/04/2017
59 1080/17 GLPL Interim tariff for FY 2017-18 07/04/2017
60 593/16 (IA No. 2) BLMCL Seeking approval for award of work of developing and operating Kapurdi and Jalipa Mine to the lowest qualified bidder for selection of MDO 06/04/2017
61 876/16 M/s Rajasthan Textile Mills Association Review of Commission order dt. 24.08.2016 02/03/2017
62 959/16 RVUN Review of Commission’s order dt. 17.10.16 09/12/2016
63 760/16 GLPL ARR and Tariff for FY 2014-15, FY 2015-16 and FY 2016-17 for GLPL Unit 1 and 2. 07/12/2016
64 817/16 Discoms Determination of Cross Subsidy Surcharge for FY 2016-17 01/12/2016
65 590/16 592/16 RVPN Approval of Investment Plan, determination of ARR and tariff for FY 2016-17 and True up of ARR for FY 2014-15 27/10/2016
66 594/16 RVUN Tariff for FY16-17 and true up for FY13-14 17/10/2016
67 552/15,553/15, 554/15 JVVNL, AVVNL, Jd. VVNL Annual Revenue Requirement (ARR) Retail Supply Tariff of Discoms for FY 2015-16 and approval of true-up of ARR for FY 2013-14 and Investment Plan for FY 2015-16 22/09/2016
68 548/15 Discoms Determination of Additional Surcharge 24/08/2016
69 - Suo-Motu Determination of generic tariff for Biomass for FY 2016-17 23/08/2016
70 - Suo-Motu Determination of generic tariff for Solar for FY 2016-17 23/08/2016
71 701/16 RVUN Review of Tariff order dated 07.09.2015 08/08/2016
72 445/14 486/14 652/16 RWPL Determination of Tariff 04/08/2016
73 492/14 595/15 GLPL Tariff for FY 15-16 and 16-17 14/07/2016
74 245/11 BLMCL Determination of transfer price 29/06/2016
75 648/16 RVPN Adoption of tariff of 400 kV D/C Suratgarh-Bikaner Transmission Line Project through PPP mode availing VGF. 21/06/2016
76 - Suo-Motu Generic tariff of Wind Power Plants for FY 2016-17. 25/05/2016
77 244/11 383/13 and 423/13 RWPL Determination of tariff 19/05/2016
78 312/12 341/12 424/13 446/14 and 487/14 BLMCL Determination of transfer price 19/05/2016
79 548/15 Discoms Determination of Additional Surcharge 12/05/2016
80 625/16 and 626/16 JdVVNL Determination of pooled cost of power purchase for FY 2014-15 and 2015-16 01/04/2016
81 592/16 RVPN Interim tariff FY 2016-17 31/03/2016
82 594/16 RVUN Interim tariff FY 2016-17 31/03/2016
83 595/16 GLPL Interim tariff FY 2016-17 31/03/2016
84 584/15 AVVNL Determination of pooled cost of power purchase for FY 2014-15 and 2015-16 31/03/2016
85 606/16 and 607/16 JVVNL Determination of pooled cost of power purchase for FY 2014-15 and 2015-16 31/03/2016
86 593/16 652/16 RWPL BLMCL Adhoc tariff and transfer price for FY 2016 -17 31/03/2016
87 464/14 M/s Raj West Power Ltd. Determination of Final Tariff for FY 2009-10 to FY 2013-14 for Units 1 to 8 and true up for FY 2009-10 and FY 2010-11. 24/02/2016
88 486/14 487/14 RWPL BLMCL Adhoc tariff and transfer price for FY 2015 -16 25/01/2016
89 579/15 RVUN Provisional Tariff for Unit-2 KaTPP 21/01/2016
90 537/15 RVUN Determination of Capital Cost, ARR and Provisional Tariff for Unit 4 of CTPP for FY 2014-15 01/01/2016
91 - Suo-Motu Determination of Biomass fuel price for FY 2015-16 09/09/2015
92 491/14 RVUN Determination of ARR and tariff For FY 2015-16 and approval of True-up of ARR for FY 2012-13 07/09/2015
93 488/14 499/14 RVPN Investment Plan FY16, Tariff for FY16 and True up for FY13-14 14/08/2015
94 481/14 RVUN Determination of ARR and Tariff for Giral Unit-2 for FY 2010-11 (20 days) to 2013-14 12/08/2015
95 483/14 GLPL Determination of ARR and Tariff of Giral Unit-1 for FY 2011-12 to FY 2013-14 12/08/2015
96 - Suo-Motu Generic tariff for Biomass based power plants for FY 2015-16 08/07/2015
97 537/15 RVUN Interim tariff for CTPP Unit-4 for FY 2014-15 and FY 2015-16 24/06/2015
98 486/14 487/14 RWPL BLMCL I.A. No. 2 modification of the interim tariff 19/06/2015
99 -- Suo-Motu Determination of generic tariff for Solar Power Projects for FY 2015-16 19/06/2015
100 452/14 RVUN determination of ARR and provisional Tariff for FY 2014-15 for RGTPP Stage III 18/06/2015
101 451/14 RVUN determination of ARR and provisional Tariff for FY 2013-14 for RGTPP Stage III (1X110 MW GT) 17/06/2015
102 -- Suo-Motu Determination of generic tariff for Wind Power Plants for FY 2015-16 29/05/2015
103 450/14 RVUN Determination of ARR and Provisional Tariff for Unit # 3 of CTPP for FY 2013-14 22/05/2015
104 462/14 RVUN determination of ARR and provisional Tariff for FY 2014-15 for Kalisindh Unit-1 14/05/2015
105 -- Suo-Motu Interim Tariff of Biomass plants for FY15-16 05/05/2015
106 486/14 487/14 RWPL BLMCL Interim tariff for FY 2015-16 31/03/2015
107 491/14 RVUN Interim tariff for FY 15-16 31/03/2015
108 492/14 GLPL Interim tariff for FY 15-16 31/03/2015
109 499/14 RVPN Interim tariff for FY 2015-16 31/03/2015
110 456 457 458 442 444 447/14 JVVNL AVVNL Jd VVNL Retail Supply Tariff ARR and Investment Plan of Discoms for FY 2014-15 20/02/2015
111 479/14 RVUN Review of Order dated 09.10.2014 21/01/2015
112 470/14 RVUN Modification in original scope of works of Additional Capitalization for KTPS 13/11/2014
113 460/14 GLPL determination of ARR and provisional tariff for Giral Unit-I for FY 2014-15 12/11/2014
114 453/14 RVPN Review of order dt. 09.01.14 31/10/2014
115 459/14 RVUN Tariff for FY15 and True up for FY12 09/10/2014
116 437/14 463/14 RVPN Investment Plan FY15, Tariff for FY15 and True up for FY12, FY13 09/10/2014
117 244/11 RWPL Tariff for FY12 (23 days) 18/09/2014
118 - Suo-motu Generic tariff for Solar PV and Solar thermal power projects for FY 2014-15 22/08/2014
119 448/14 RVUN Review of Commission’s Order dated 24.2.2014 20/08/2014
120 - Suo-Motu Generic tariff for Biomass Power Plants for FY15 23/07/2014
121 382/13 RVUN True up for FY11 23/07/2014
122 35312 GLPL Provisional determination of tariff for Giral Unit-I for FY 2013-14 22/07/2014
123 352/12 RVUN determination of tariff for FY 2013-14 for GLPL Unit-II 21/07/2014
124 427/13 JdVVNL Pooled cost of power purchase for FY 13 21/07/2014
125 432/13 JVVNL Pooled power purchase cost for FY 14 21/07/2014
126 439/14 JdVVNL Pooled power purchase cost for FY 14 21/07/2014
127 - Suo-Motu Generic tariff for Wind Power Plants for FY15 16/07/2014
128 391/13 406/13 JVVNL True-up of ARR for FY 11 and FY 12 15/07/2014
129 394/13 AVVNL True-up of ARR for FY 11 and FY 12 15/07/2014
130 389/13 397/13 JdVVNL True-up of ARR for FY 11 and FY 12 15/07/2014
131 450/14 452/14 462/14 RVUN Interim tariff for FY 15 for Chhabra Unit-I, RGTPP (1X160MW) and Kalisindh Unit-I 04/07/2014
132 463/14 RVPN Interim tariff FY 15 25/06/2014
133 459/14 460/14 RVUN, GLPL Interim tariff FY 15 25/06/2014
134 445/14 446/14 RWPL BLMCL Interim tariff for FY15 30/05/2014
135 426/13 AVVNL Pooled power purchase cost for FY 14 29/04/2014
136 -- Suo-Motu Interim tariff for FY15 31/03/2014
137 252/11 331/12 GLPL Tariff for GLPL Unit-I for FY 12 and FY 13 24/02/2014
138 352/12 RVUN Tariff for FY14 24/02/2014
139 257/11 323/12 RVUN Tariff for GLPL Unit-II for FY 11 FY 12 and FY 13 24/02/2014
140 456/14 457/14 458/14 442/14 444/14 447/14 Discoms Determination of ARR and Retail Supply Tariff of Discoms for FY 2014-15 along with true-up of ARR for FY 2012-13 and Approval of Investment Plan for FY 2014-15. 20/02/2014
141 374/13, 387/13, 390/13 JVVNL, AVVNL, JdVVNL Approval of Investment Plan for FY 2013-14 12/02/2014
142 428/13 JdVVNL determination of provisional pooled cost of power purchase for FY 2013-14. 12/02/2014
143 420/13 Discoms Determination of Addl. Surcharge 23/01/2014
144 429/13 RVPN Adoption of tariff, for lignite based Gurha Thermal Power Plant (70MW) 22/01/2014
145 373/13 RVPN Tariff for FY14 09/01/2014
146 353/12 GLPL CoD Order for Giral Unit 1 23/12/2013
147 352/12 RVUNL CoD Order for Giral Unit 2 23/12/2013
148 370/13 RVPN Investment Plan for FY14 11/12/2013
149 413/13 RVUN Review of order 06.06.13 10/12/2013
150 395/13 JdVVNL Pooled power purchase cost FY12 10/12/2013
151 271/11, 304/12 JVVNL True up of FY09 , FY10 04/12/2013
152 262/11 AVVNL True up of FY08,FY09,FY10 04/12/2013
153 269/11,274/11 JdVVNL True up of FY09, FY10 04/12/2013
154 423/13, 424/13 Raj WestPower and BLMCL Adhoc Tariff and transfer price for FY14 11/10/2013
155 -- Suo-Motu Generic Tariff for Biomass Power Projects 08/10/2013
156 -- Suo-Motu Generic Tariff for Solar Power Projects 04/09/2013
157 311, 312, 349, 341/12 Raj WestPower and BLMCL Provisional Tariff and transfer price for FY12-13 30/08/2013
158 352/12 RVUN Adhoc tariff for FY 14 01/07/2013
159 311,312, 340 341/12(IA) Raj WestPower and BLMCL Interim tariff and transfer price for FY14 28/06/2013
160 353/12 GLPL Interim tariff for FY14 28/06/2013
161 356,357 and 358/12 JVVNL, AVVNL Jd VVNL Retail Supply Tariff for FY 2013-2014 06/06/2013
162 285/11,314/12 RVUN Tariff for RVUN power stations for FY13 06/06/2013
163 -- Suo-Motu Tariff for wind power plants for FY13-14 17/05/2013
164 311,312, 340 341/12(IA) Raj WestPower and BLMCL Interim tariff and transfer price for FY14 04/04/2013
165 352/12 RVUN Adhoc tariff for FY 14 04/04/2013
166 373/13 RVPN Adhoc transmission tariff for FY 14 02/04/2013
167 335,336,338/12 Discoms pooled cost of power purchase for FY -13 11/01/2013
168 277/11, 315/12 RVPN Transmission Tariff for FY13 and true up for FY10 , FY11 10/01/2013
169 342/12 Sh. D.P. Chirania Review of order dt 08.08.12 24/12/2012
170 --- Suo - Motu Generic Levellised Tariff for Biomass Power Plants FY-13 21/12/2012
171 --- Suo - Motu Clarification of order 8.8.12 21/11/2012
172 316/12 Discoms Introduction of Time of Day Tariff 08/11/2012
173 283/11 RVUN Addl. Capitalization of STPS 31/10/2012
174 311,312, 340 341/12(IA) Raj WestPower and BLMCL Interim tariff and transfer price 15/10/2012
175 --- Suo- Motu Generic Levellised Tariff for wind Power Plants FY-13 07/09/2012
176 278/11 279/11 and 280/11 JVVNL AVVNL and Jd VVNL Retail Tariff for FY-12-13 08/08/2012
177 250/11 RVPN Corrigendum-Approval of ARR and tariff for FY 2011-12 07/08/2012
178 331/12 GLPL Interim tariff for Giral Unit -I 17/07/2012
179 255/11 and 256/11 ATSCL and MTSCL Adoption of Transmission Charges 01/06/2012
180 323/12 RVUN Interim tariff for Giral Unit -II 31/05/2012
181 ----- Suo- Motu Generic Levellised Tariff for Solar Power Plants 30/05/2012
182 258/11 RVUN Review of order dt. 27.04.11 for true-up 10/05/2012
183 314/12 RVUN Interim tariff for Chhabra TPS 03/04/2012
184 311/12 and 312/12 Raj WestPower Ltd. and BLMCL Interim tariff and transfer price 02/04/2012
185 285/11 RVUN Interim tariff 30/03/2012
186 315/12 RVPN Interim transmission tariff 30/03/2012
187 250/11 RVPN Approval of ARR and tariff for FY 2011-12 23/12/2011
188 ----- Suo- Motu Revised Tariff for Wind Plants FY-11,FY-12 14/12/2011
189 213/10 RVPN Corrigendum of Tariff order FY-11 09/12/2011
190 ----- Suo- Motu Revised Tariff for Bio mass-09-10 09/12/2011
191 ----- Suo- Motu Revised Tariff for Bio mass-10-11 09/12/2011
192 ----- Suo- Motu Revised Tariff for Bio mass-11-12 09/12/2011
193 237/10 RVUN Tariff for RVUN stations for FY12 30/11/2011
194 259/11, 261/11 and 266/11 AVVNL , JVVNL and Jd. VVNL pooled cost of power purchase for FY -12 02/11/2011
195 244/11 Rajwest Power Ltd Determination provisional tariff for unit 3,4 21/10/2011
196 244/11 and 245/11 Rajwest Power Ltd. and Barmer Lignite Mining Ltd. Determination provisional tariff and transfer price 30/09/2011
197 238,239and 240/10 JVVNL, AVVNL, Jd VVNL ARR and Tariff for FY12 08/09/2011
198 244/11 and 245/11 Rajwest Power Ltd. and Barmer Lignite Mining Ltd. Determination provisional tariff and transfer price 17/08/2011
199 242/11 Rajasthan Renewable Energy Corporation Tariff for 1 MW solar power plant 17/08/2011
200 215/10 RVUN Tariff for Chhabra TPS Unit-I for FY 11 and FY 12 13/06/2011
201 212/10 RVUN Truing up of RVUN power stations for FY05-08 27/04/2011
202 --- Sou-motu Wheeling charges and Surcharge-FY12 31/03/2011
203 209/09 RVUN Tariff for RVUN stations for FY11 16/11/2010
204 --------- Suo-Motu Amendment in Generic tariff for Solar Power Plants 29/09/2010
205 213/10 RVPN Transmission Tariff for FY11 16/09/2010
206 217/10 RVPN Adoption of tariff in case I bid 31/05/2010
207 207/10 RVUN Tariff for KTPS(VII) & STPS (VI) Units 27/05/2010
208 ------ Suo-motu Generic tariff for Solar Power Plants  25/05/2010
209 210/09 M/s Raj westpower Review of order dt. 13.11.09 17/05/2010
210 180/09 M/s JdVVNL Multi Year-ARR- FY10-14 & Truing UP FY08 15/04/2010
211 181/09 M/s JVVNL Multi Year-ARR- FY10-14 & Truing UP FY09 15/04/2010
212 185/09 M/s AVVNL Multi Year-ARR- FY10-14 & Truing UP FY10 15/04/2010
213 -------- RVPN Interim tariff for FY11 31/03/2010
214 ------- Suo-motu Wheeling charges Surcharge-FY11 31/03/2010
215 -------- Suo-motu Determination of tariff for Bio-mass plantsfor FY11 31/03/2010
216 -------- Suo-motu Determination of tariff for wind for FY11 31/03/2010
217 209/09 RVUN Intrim tariff for FY11 31/03/2010
218 215/10 RVUN Provisional Tariff for Chhabra TPS (U-I) 11/03/2010
219 206/09 RVUN Review of tariff order dated 31.8.09 21/01/2010
220 207/09(IA) RVUN Intrim Tariff for KTPS(U-6) & STPS (U-7) 16/12/2009
221 184/09 M/s Raj WestPower Ltd. Provisional Tariff for first two units of 135 MW each of Raj WestPower Limited 13/11/2009
222 179/09 M/s RVUN  Multi Year-ARR- FY10-14 & Tariff FY-10 31/08/2009
223 184/09 (IA) M/s Raj West Power Ltd. Tariff for infirm power 28/08/2009
224 __ Suo-motto Tariff  for biomass power plants 17/08/2009
225 201/09 M/s RVPN Ltd. Approval of deviation in bidding guidelines 11/08/2009
226 186/09 M/s RVPN Ltd. Multi Year-ARR- FY10-14 and Tariff FY-10 01/08/2009
227 167/08 M/s RVPN Ltd. Truing up of ARR for FY-05, FY-06 and FY-07 01/08/2009
228  __ Suo-motto Tariff for wind power Plants 16/07/2009
229 __ Suo-motto  Wheeling charges & Surcharge-FY10 31/03/2009
230 186/09(IA) M/s RVPN Ltd. Intrim Tariff for  FY-10 30/03/2009
231 179/09 (IA) M/s RVUN  Intrim Tariff for  FY-10 30/03/2009
232 129,137,139,140,141,142/07 M/s JVVNL M/s JdVVNL M/s AVVNL Truing up of ARR for FY-06,07 and Correction of ARR for FY-09 of Discoms 11/09/2008
233 129,137,139,140,141,142/07 M/s JVVNL M/s JdVVNL M/s AVVNL Truing up of ARR for FY-06 and 07 and Correction of ARR for FY-09 of Discoms 11/09/2008
234 165/08 M/s RVUN  Tariff  for FY09 28/06/2008
235  __ Suo-motto Tariff of Inadvertant Power fom CPP 16/04/2008
236  __ Suo-motto Tariff for Solar Power Plants covered under GoI Policy 02/04/2008
237 143/07 M/s RVPN Ltd.  ARR for  FY-09 31/03/2008
238 165/08 (IA) M/s RVUN  Intrim Tariff for  FY-09 29/03/2008
239 130/07 Suo-motto Rationalization of Retail Tariffs for Vitran Nigams in Rajasthan 31/08/2007
240  __ Suo-motto  Wheeling charges and Surcharge-FY-08 22/08/2007
241 121/07 M/s JVVNL MY ARR FY 09 of Jaipur, Ajmer and Jodhpur 31/03/2007
242 120/07 M/s AVVNL MY ARR FY 09 of Jaipur, Ajmer and Jodhpur 31/03/2007
243 119/07 M/s JdVVNL MY ARR FY 09 of Jaipur, Ajmer and Jodhpur 31/03/2007
244 118/07 M/s RVUN  Tariff for new generation projects of RVUN 21/03/2007
245 -- Sou-motu Review of Tarriff for wind and biomass projects 14/03/2007
246  __ Suo-motto Tarriff for wind and biomass projects 09/03/2007
247 112 & 117/ 06 M/s RVPN Ltd. Multi Year-ARR  & Tariff FY-07-09 07/03/2007
248 115/06 Suo-motto Multi Year-ARR  and Tariff FY-07-09 for RVUN 12/01/2007
249 107/06 Suo-motto Truing up orders of JVVNL, AVVNL, JdVVNL from FY01- 05 09/01/2007
250 108/06 Suo-motto Truing up orders of JVVNL, AVVNL, JdVVNL from FY01- 05 09/01/2007
251 109/06 Suo-motto Truing up orders of JVVNL, AVVNL, JdVVNL from FY01- 05 09/01/2007
252 105/06 M/s Hindustan Zinc Limited Tariff of power from CPP at Chanderiya  FY-07 28/11/2006
253 46/05, 47/05, 51/05 JdVVNL, AVVNL , JVVNL Determination of tariff for deemed licensees 23/11/2006
254  110/06 M/s RajWest Power Corrigendum to Raj West Power 26/10/2006
255  110/06 M/s RajWest Power In principle determination of Capital Cost, Transfer price of Lignite and Cost of generation from 1000 MW lignite based thermal power plant 19/10/2006
256 84/06 JdVVNL Wheeling Surcharge 07 19/09/2006
257 85/06 JVVNL Wheeling Surcharge 07 19/09/2006
258 86/06 AVVNL Wheeling Surcharge 07 19/09/2006
259 71/05 M/s Jd VVNL ARR for FY-07 21/07/2006
260 70/05 M/s A VVNL ARR for FY-07 21/07/2006
261 72/05 M/s J VVNL ARR for FY-07 21/07/2006
262 88/06 M/s RVUN  Tariff for generation Stations of RVUN for FY-07 17/07/2006
263 60/05 M/s RVPN Ltd. Tariff for Transmission & SLDC FY-07 31/03/2006
264 __ M/s JdVVNL ARR-06 22/09/2005
265 __ M/s AVVNL ARR-06 22/09/2005
266 __ M/s JdVVNL ARR-06 22/09/2005
267 __ M/s JVVNL ARR-06 17/09/2005
268 44/05 M/s RVUNL Tariff for generation Stations  FY-06 09/06/2005
269 43/05 M/s RVPNL Tariff for transmission of electricity and SLDC charges for FY-06 02/05/2005
270 40/04 M/s JVVNL Wheeling Charges and Surcharge FY-06 21/02/2005
271 42/0 M/s JdVVNL Wheeling Charges and Surcharge FY-06 21/02/2005
272 41/04 M/s AVVNL Wheeling Charges and Surcharge FY-06 21/02/2005
273 40/04 M/s JVVNL Wheeling Charges and Surcharge FY-06 21/02/2005
274 42/0 M/s JdVVNL Wheeling Charges and Surcharge FY-06 21/02/2005
275 41/04 M/s AVVNL Wheeling Charges and Surcharge FY-06 21/02/2005
276 36/04 M/s AVVNL Tariff for Fy -05 17/12/2004
277 37/04 M/s JdVVNL Tariff for Fy -05 17/12/2004
278 35/04 M/s JVVNL Tariff for Fy -05 17/12/2004
279 31/04 M/s RVUNL Tariff for generation Stations  FY-05 07/10/2004
280 31/04 M/s RVUNL Tariff for generation Stations  FY-05 07/10/2004
281 26/03 M/s RVPNL ARR and Tariff for transmission of electricity and SLDC charges for FY-05 17/04/2004
282 -- M/s JVVNL ARR for FY-04 and 05 17/04/2004
283 -- M/s JdVVNL ARR for FY-04 and 05 17/04/2004
284 -- M/s RVPNL ARR for FY-04 31/07/2003
285 -- M/s JVVNL ARR for FY-04 10/06/2003
286 -- M/s AVVNL ARR for FY-04 10/06/2003
287 -- M/s JdVVNL ARR for FY-04 10/06/2003
288 13/02 M/s RIICO and Jaipur Nagar Nigam Review of tariff of PSL as per order dt. 24.3.02 04/05/2002
289 11/02 M/s RIICO and Jaipur Nagar Nigam Review of tariff of PSL as per order dt. 24.3.01 04/05/2002
290 12/02 DRM (Electrical) Western Railway, Jaipur Review of tariff orde dt. 24.3.01 01/04/2002
291 09/01 M/s Rajasthan Ginning and Pressing Industries Association, Sriganganagar Review of tariff orde dt. 24.3.01 10/10/2001
292 05/00 M/s  AVVNL Tariff for retail supply of electricity FY-01 24/03/2001
293 07/00 M/s  JdVVNL Tariff for retail supply of electricity FY-01 24/03/2001
294 08/00 M/s RVPNL Tariff for transmission of electricity FY-01 24/03/2001
295 06/00 M/s  JVVNL Tariff for retail supply of electricity FY-01 24/03/2001