1 1484/19 M/s Rajasthan Patrika Pvt. Ltd. Under Regulation 31 of RERC Open Access Regulations 2016 for removal of difficulties regarding re-allocation of solar power for captive consumption 04/11/2019
2 1483/19 M/s HNV Castings Pvt. Ltd. Redressal of grievance under Regulation 30(3) of Rajasthan Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2016 15/10/2019
3 1533/19 M/s Oswal Woolen Mills Ltd. Review cum clarificatory petition filed for adjudication of dispute under Section 86(1)(f) read with Section 142 of the Electricity Act for non-compliance of Commission’s order 15/10/2019
4 1271/17 Rajasthan Renewable Energy Corporation Ltd. Non-compliance of Commissions order dated 23.03.2017 15/10/2019
5 1511/19 1531/19 1382/18 1406/18 1431/18 and 1495/19 M/s Tanot Wind Power Ventures Pvt. Ltd. Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Settlement and related matters of Solar and Wind Generation Sources) Regulations, 2017 27/09/2019
6 1552/19 JVVNL For redressal of grievance under Regulation 30 (3) of RERC ( Terms and Conditions for Open Access) Regulations, 2016 27/09/2019
7 1505/19 M/s DSR Steel Pvt. Ltd. Seeking redressal of grievances under Regulation 30 (3) of RERC (Terms and Conditions of Open Access) Regulations, 2016 24/09/2019
8 1497/19 M/s HNV Castings Private Ltd. Non-compliance of Commission’s order dated 28.02.2019 24/09/2019
9 1384/18 M/s Adani Power Rajasthan Ltd. Adjudication of dispute 24/09/2019
10 1454/19 JVVNL Seeking amendment in RERC (Transmission Licensee’s Standards of Performance) Regulations, 2004 17/09/2019
11 1487/19 M/s Rollz Material Handling Systems Private Ltd. Seeking direction to imply agriculture tariff to Solid Waste Management Project 12/09/2019
12 1424/18 RVPN Approval of Investment Plan for FY 2019-20 11/09/2019
13 1317/18 RVUNL Adjudication of dispute 04/09/2019
14 1453/19 Western Central Railway Seeking direction to provide Long Term Open Access for its Captive Wind Power Plant 04/09/2019
15 1480/19 M/s Indus Tower Ltd. Non-compliance of Ombudsman’s order dt. 18.10.2018 27/08/2019
16 1518/19 1519/19 1520/19 M/s Roha Dyechem Pvt. Ltd. and Ors. Review cum clarificatory petition filed for adjudication of dispute under Section 86(1)(f) read with Section 142 of the Electricity Act for non-compliance of Commission’s order 27/08/2019
17 1508/19 JVVNL Seeking approval for construction of electrical infrastructure to provide electricity connection to Industrial area in village Nangal 22/08/2019
18 1459/19 RVUNL Seeking in-principle approval of capital expenditure for implementation of revised emission norms for RVUN’s power plants 21/08/2019
19 1416/18, 1419/18, 1422/18 JVVNL AVVNL JdVVNL Determination of ARR and tariff for FY 2019-20 07/08/2019
20 1537/19 1538/19 M/s RSWM Ltd and Ors Adjudication of dispute 02/08/2019
21 889/2016 890/2016 1325/2018 M/s Dhariwal Industries Ltd. and Ors. Adjudication of dispute 30/07/2019
22 - Suo-Motu Methodology of additional charges for violation of sign change under DSM Mechanism 25/07/2019
23 1456/19 M/s Casablanca Industries Pvt. Ltd. Redressal of disputes under Regulation 30 (3) of RERC Open Access Regulation 2016 against levy of excess drawl penal charges 19/07/2019
24 1379/18 M/s Bhiwadi Iron Pvt. Ltd. Redressal of disputes under Regulation 30 (3) of RERC Open Access Regulation 2016 against levy of excess drawl penal charges 18/07/2019
25 1457/19 M/s Bhiwadi Iron Private Ltd. Review of Commission’s Order dated 02.01.2019 passed in petition no. RERC/1379/18 18/07/2019
26 1443-1449/19,1488-1494/19,1498-1501/19,1512/19,1521-1524/19 M/s Jivraj Tea Ltd. and Ors Adjudication of dispute (LPS) 18/07/2019
27 1383/18 M/s Rajasthan Gums Pvt. Ltd. Seeking relief for Change in Law events in terms of CEA (Technical Standards for Connectivity to the Grid) Regulations, 2013 11/07/2019
28 1425/18 1427/18 1428/18 M/s Meels Hotels Pvt. Ltd. and Ors Adjudication of dispute 13/06/2019
29 1464/19 JVVNL AVVNL JdVVNL Recovery of additional power purchase cost through special FSA 13/06/2019
30 1329/18 M/s JSW Energy (Barmer) Ltd. Seeking in-principle approval for additional capitalization on account of up gradation of Electrostatic Precipitators and Lime Handling System. 30/05/2019
31 - Suo-Motu Forms for furnishing ARR, Tariff and Truing up proposals for Distribution Licensee 30/05/2019
32 - Suo-Motu Forms for furnishing ARR,Tariff and truing up proposals for Generating companies, Transmission Licensee and SLDC 30/05/2019
33 1426/18 M/s JSW Energy (Barmer) Ltd. Adjudication of dispute 22/05/2019
34 1429/18 M/s Kalpataru Power Transmission Ltd. Adjudication of dispute 22/05/2019
35 1461-1463/19 1465-1468/19 M/s Goyal Fashions Pvt. Ltd. and Ors. Adjudication of dispute 17/05/2019
36 - Suo-Motu Tariff Regulations, 2019 10/05/2019
37 1327/18 M/s Tesco Energy Two Pvt. Ltd. Adjudication of dispute 08/05/2019
38 1367/18 State Load Despatch Centre Adjudication of dispute regarding demand of UI/Deviation charges 23/04/2019
39 577/15 M/s Adani Power Rajasthan Ltd. determination of compensation/tariff adjustment 23/04/2019
40 1380/18 M/s Sorabh Cement Ltd. Redressal of disputes under Regulation 30 (3) of RERC Open Access Regulation 2016 23/04/2019
41 1375, 1389, 1391-1393, 1440/18 M/s Jai Mangal Infrapowers Pvt. Ltd. and Ors. Adjudication of dispute 23/04/2019
42 1452/19 Jaipur Vidyut Vitran Nigam Ltd. Levy of open access charges on energy drawan 23/04/2019
43 1374/18 M/s Arjun Green Power Pvt. Ltd. Adjudication of dispute 23/04/2019
44 1390/18 RVPN Regarding rebate for prompt payment 23/04/2019
45 1455/19 JVVNL Request to waive off the short fall in RPO 05/04/2019
46 1395-1401, 1408-1412, 1430, 1432-1438/2018, 1450-1451/2019, 1460/2019, 1469-1471/2019, 1475-1476/2019 Rajasthan Gums Pvt. Ltd. and Ors Adjudication of dispute 22/03/2019
47 1407/18 M/s Balaji Forgings Pvt. Ltd. Review of Eleventh Amendment of RERC (Electricity Supply Code and Connected Matters) Regulations, 2004 08/03/2019
48 - Suo-Motu RERC (Renewable Energy Certificate and Renewable Purchase Obligation Compliance Framework) (Third Amendment) Regulations, 2019 05/03/2019
49 - Suo-Motu Second Amendment in Tariff Regulations of Wind and Solar Energy and First Amendment in Tariff Regulations of Biomass, Biogas and Biomass Gasifier 05/03/2019
50 - Suo-Motu RERC (Deviation Settlement Mechanism and related matters) (First Amendment) Regulations, 2019 05/03/2019
51 - Suo-Motu RERC (Connectivity and Net Metering for Rooftop and Small Solar Grid Interactive Systems) (First Amendment) Regulations, 2019 05/03/2019
52 1372/18 M/s Sunbeam Auto Pvt. Ltd. Non-compliance of SLDC’s order 28/02/2019
53 1381/18 M/s Garima Overseas Ltd. Non-compliance of SLDC’s order 28/02/2019
54 431/13 1388/18 RVPN and M/s SKS Power Generation (Chhattisgarh) Ltd. Adoption of tariff regarding procurement of 1000 MW power through case-I bidding 26/02/2019
55 1321/18 M/s Nirma Ltd. For redressal of grievance under Regulation 30 (3) of RERC ( Terms and Conditions for Open Access) Regulations, 2016 22/02/2019
56 1342/18 M/s Energo Engineering Projects Ltd. Adjudication of dispute 22/02/2019
57 - Suo-Motu RERC (Service) (Fifth Amendment) Regulations, 2019 14/02/2019
58 1371/18 M/s Ramayana Ispat Pvt. Ltd. Review of Eleventh Amendment of RERC (Electricity Supply Code and Connected Matters) Regulations, 2004 08/02/2019
59 1373/18 M/s Adani Power Rajasthan Ltd. Determination of the compensation/adjustment in tariff 08/02/2019
60 1331/18 1332/18 1333/18 M/s Vitesse Pvt. Ltd. and Ors. Adjudication of dispute 31/01/2019
61 1394/18 M/s Adani Power Rajasthan Ltd. Seeking declaration for Change in Law in respect of installation of additional systems in compliance with the revised Environment norms 25/01/2019
62 - Suo-Motu RERC (Power Purchase and Procurement Process of Distribution Licensees) (Fifth Amendment) Regulations, 2018 RERC (Renewable Energy Obligation) (Fifth Amendment) Regulations, 2018 11/01/2019
63 1197/17 JVVNL AVVNL JdVVNL Seeking directions on the procurement of power 09/01/2019
64 1372/18 M/s Sunbeam Auto Pvt. Ltd. Non-compliance of SLDC’s order 09/01/2019
65 I.A. No.6 in 392/13 M/s Adani Power Rajasthan Ltd. Seeking clarification of Order dated 17.05.2018 08/01/2019
66 1271/17 Rajasthan Renewable Energy Corporation Ltd. Non-compliance of Commission’s order dated 23.03.2017 04/01/2019
67 - Suo-Motu RERC (Fee) Regulations, 2018 31/12/2018
68 1378/18 M/s ACME Jodhpur Solar Power Pvt. Ltd. and Ors Adjudication of dispute 26/12/2018
69 1377/18 M/s Tanot Wind Power Ventures Pvt. Ltd. For consideration of issues decided by Commission in its tariff order dt. 29.05.2015. 20/12/2018
70 1354/18 M/s Shri Kripa Industries LLP Redressal of grievances under Regulation 30 (3) of RERC (Terms and Conditions for Open Access) Regulations, 2016 14/12/2018
71 1304/17 1305/17 1306/17 M/s K.S. Oils Ltd. Non-Compliance of Commission’s Orders issued in the matter of Late Payment Surcharge 10/12/2018
72 1241-1248/17, 1263/17, 1281-1282/17, 1299/17, 1311/18, 1314/18, 1322/18, 1350-1351/18, 1353/18, 1358/18 and 1386/18 M/s Dhanuka Agritech Limited and Ors Adjudication of dispute (LPS) 10/12/2018
73 1249-1250/17, 1259-1260/17, 1262/17, 1312/18, 1328/18, 1338-1339/18, 1341/18, 1347-1348/18 and 1387/18 M/s Mukand Industries Pvt. Ltd. and Ors Non-Compliance of Commission’s Orders issued in the matter of Late Payment Surcharge 10/12/2018
74 1360/18 M/s Dalas Biotech Ltd. Redressal of grievances under Regulation 30 (3) of RERC (Terms and Conditions for Open Access) Regulations, 2016 10/12/2018
75 1388/18 M/s SKS Power Generation (Chhattisgarh) Ltd. Adoption of tariff through case-I bidding 16/11/2018
76 1235/17 M/s Tirupati Fibres and Industries Ltd. Non-compliance of Commission’s order dated 17.04.2017 15/11/2018
77 1239/17 M/s Ultratech Cement Ltd. Seeking clarifications regarding Commission’s order dated 13.06.2017 15/11/2018
78 1368/18 M/s ITC Ltd. Adjudication of dispute 15/11/2018
79 1324/18 M/s Railway Energy Management Co. Ltd. Adjudication of dispute 05/11/2018
80 1385/18 M/s V. S. Lignite and Power Ltd. Challenging not grant of NOC by SLDC for Short term open access 01/11/2018
81 1362/18 1363/18 M/s Hindustan Zinc Ltd. Adjudication of dispute 31/10/2018
82 475/14 M/s Shree Cement Ltd. Adjudication of dispute 25/10/2018
83 476/14 M/s DCM Shriram Ltd. Adjudication of dispute 25/10/2018
84 431/13 RVPN Adoption of tariff regarding procurement of 1000 MW power through case-I bidding 16/10/2018
85 1349/18 M/s Bhavik Terryfab For redressal of grievance under Regulation 30 (3) of RERC ( Terms and Conditions for Open Access) Regulations, 2016 12/10/2018
86 1355/18 M/s M R Industries For redressal of grievance under Regulation 30 (3) of RERC ( Terms and Conditions for Open Access) Regulations, 2016 12/10/2018
87 1276/17 M/s V. S. Lignite Power Private Ltd. Adjudication of dispute 12/10/2018
88 1345/18 M/s JK Cement Works Adjudication of dispute 09/10/2018
89 1369/18 M/s Rajwest Power Ltd. Adjudication of dispute 04/10/2018
90 577/15 M/s Adani Power Rajasthan Ltd. For determining the compensation/tariff adjustment 24/09/2018
91 1212/17 M/s Kishangarh Hi-Tech Textile Park Ltd. Adjudication of dispute 24/09/2018
92 1366/18 M/s Synergy Steels Ltd. For redressal of grievance under Regulation 30 (3) of RERC ( Terms and Conditions for Open Access) Regulations, 2016 24/09/2018
93 1378/18 M/s ACME Jodhpur Solar Power Pvt. Ltd. and Ors Adjudication of dispute 18/09/2018
94 1326/18 M/s Indian Railways Seeking refund of the connectivity charges from RVPN. 18/09/2018
95 1370/18 Rajasthan Urja Vikas Nigam Ltd. Approval of bidding document along with PPA for procurement of 450 MW of electricity under Case-4 14/09/2018
96 1320/18 Jaipur Vidyut Vitran Nigam Ltd. Seeking approval for setting up of charging stations for electric vehicles. 07/09/2018
97 1308/17 Sunstar Management Consulting Group Seeking directions for implementation of the Net Metering Regulations 05/09/2018
98 1318/18 Indian Wind Power Association Seeking relaxation in effective date and clarification on other provisions of RERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2017 05/09/2018
99 1344/18 Jaipur Vidyut Vitran Nigam Ltd. Seeking directions for amendment in Regulation 33 of RERC (Terms and conditions for determination of Tariff) Regulations, 2014 05/09/2018
100 1319/18 Discoms Review of Commission’s Order dated 09.01.2018 14/08/2018
101 1346/18 M/s Shree Cement Ltd. Seeking amendment in Regulation 2 of RERC (Terms and conditions for determination of tariff for renewable energy sources-Wind and Solar Energy) Regulations, 2014 14/08/2018
102 1323/18 M/s Arjun Green Power Pvt. Ltd. Adjudication of dispute 31/07/2018
103 1274/17 Discoms Review of Commission’s order dated 27.04.2017 29/05/2018
104 1277/17 RWPL Adjudication of dispute 29/05/2018
105 1283/17 RWPL Adjudication of dispute regarding Change in Law 29/05/2018
106 1220/17 RWPL Adjudication of dispute regarding Change in Law 29/05/2018
107 431/13 RVPN Adoption of tariff regarding procurement of 1000 MW power through case-I bidding 29/05/2018
108 392/13 M/s Adani Power Rajasthan Ltd. Adjudication of dispute 17/05/2018
109 1343/18 BLMCL Review of Commission’s Order dated 05.04.2018 17/05/2018
110 1330/18 M/s Hindustan Zinc Ltd. Representation in the matter of Deviation Settlement Mechanism and related matters 16/05/2018
111 1265/17 RVUN In-principle approval of additional capitalization for providing Sewer System at STPS Unit 1-6 10/05/2018
112 1335/18 M/s Hadoti Power Transmission Service Limited Approval under Section 17 of the Electricity Act, 2003 04/05/2018
113 1336/18 M/s Thar Power Transmission Service Limited Approval under Section 17 of the Electricity Act, 2003 04/05/2018
114 1337/18 M/s Barmer Power Transmission Service Limited Approval under Section 17 of the Electricity Act, 2003 04/05/2018
115 1275/17 M/s Bonafide Arts Pvt. Ltd. Adjudication of dispute under Regulation 30 (3) of RERC (Terms and Condition for Open Access) Regulations, 2016 01/05/2018
116 1270/17 M/s Adani Power Rajasthan Ltd. Change in Law 12/04/2018
117 958/16 965/16 M/s Clean Wind Power (Devgarh) Pvt. Ltd. and Ors. Adjudication of dispute 05/04/2018
118 1261/17 RVUN Amendment in RERC (Rajasthan Electricity Grid Code) Regulation, 2008. 04/04/2018
119 1303/17 Discoms For clarification regarding duration of the PPAs executed under REC frame work 22/03/2018
120 1269/17 M/s Agrawal Solar Power Ventures (Rajasthan) Pvt. Ltd. Adjudication of dispute 21/03/2018
121 1220/17 RWPL Adjudication of dispute 21/03/2018
122 1283/17 RWPL Adjudication of dispute 21/03/2018
123 1264/17 M/s Jai Mangal Infrapowers Pvt.Ltd. Adjudication of dispute 21/03/2018
124 1124/17 RWPL Review of Commission’s Order dated 24.2.2016 21/03/2018
125 1307/17 M/s Mangalam Cement Ltd. Review of Commission’s Order dated 26.09.2017 27/02/2018
126 1315/18 M/s Energo Engineering Projects Ltd. Adjudication of dispute 27/02/2018
127 1278/17 M/s Dhursar Solar Power Pvt. Ltd. Review of Commission’s order dated 01.11.2017 27/02/2018
128 1252/17 M/s Shekhawati Transmission Service Company Ltd. Adjudication of dispute 22/02/2018
129 1302/17 M/s National Enterprises Adjudication of dispute 24/01/2018
130 1313/18 M/s Adani Power Rajasthan Limited For approval of Supplementary Power Purchase Agreement 24/01/2018
131 879/16 M/s Gurha Thermal Power Company Ltd. and Ors Adjudication of dispute 09/01/2018
132 1240/17 RVUN Review of Commission’s order dt. 20.06.2017 09/01/2018
133 1297/17 and 1298/17 RREC Review of Commission’s Order dated 09.11.2017 09/01/2018
134 1266/17 M/s Aravali Transmission Service Co. Ltd. Approval under Section 17 of the Electricity Act, 2003 05/01/2018
135 1267/17 M/s Maru Transmission Service Co. Ltd. Approval under Section 17 of the Electricity Act, 2003 05/01/2018
136 1300/17 M/s Mangalam Cement Ltd. For clarification in the Commission’s order dt. 26.09.2017 02/01/2018
137 1301/17 M/s BLS Ecotech Ltd. For clarification of the Commission’s order dt. 27.11.2017 02/01/2018
138 1223/17 1224/17 M/s Ramayana Ispat Pvt. Ltd. Adjudication of dispute under Regulation 30 (3) of RERC (Terms and Condition for Open Access) Regulations, 2016 21/12/2017
139 1279/17 1280/17 M/s Raghuveer Metal Industries Ltd. M/s Ratnakar Ispat India Pvt. Ltd. Adjudication of dispute under Regulation 30 (3) of RERC (Terms and Condition for Open Access) Regulations, 2016 07/12/2017
140 1268/17 M/s Sri Kastur Chand Daga Solar Power Inc. Adjudication of dispute 07/12/2017
141 593/16 BLMCL determination of Transfer Price of Lignite from Kapurdi Mine for FY 2016-17 04/12/2017
142 786-799, 812-815, 847,1164-1176,1196/17, Renew Wind Energy (AP 3) Pvt. Ltd. Backing down of generation of electricity 29/11/2017
143 923/16, 924/16, 928/16, 929/16 M/s Ultratech Cement Ltd. and Ors Adjudication of dispute under Regulation 30 (3) and 31 of RERC (Terms and Condition for Open Access) Regulations, 2016 27/11/2017
144 1007/17 M/s BLC Ecotech Ltd. Adjudication of dispute under Regulation 30 (3) and 31 of RERC (Terms and Condition for Open Access) Regulations, 2016 27/11/2017
145 1126/17, 1127/17 M/s Suncity Sheets Pvt Ltd. M/s Suncity Strips and Tubes Pvt Ltd. Adjudication of dispute 17/11/2017
146 1163/17 M/s Nirma Limited Adjudication of dispute under Regulation 30 (3) and 31 of RERC (Terms and Condition for Open Access) Regulations, 2016 17/11/2017
147 1091/17 M/s Deepak Vegpro Pvt. Ltd. Adjudication of dispute under Regulation 30 (3) of RERC (Terms and Condition for Open Access) Regulations, 2016 16/11/2017
148 1104/17 M/s Semco Electric Pvt. Ltd. Adjudication of dispute under Regulation 30 (3) and 31 of RERC (Terms and Condition for Open Access) Regulations, 2016 16/11/2017
149 1103/17, 1113/17, 1114/17 M/s Synergy Steels Ltd. and Ors Adjudication of dispute under Regulation 30 (3) of RERC (Terms and Condition for Open Access) Regulations, 2016 14/11/2017
150 867/16 RREC For non-compliance of Renewable Purchase Obligation by Discoms. 14/11/2017
151 1031/17 M/s Arjun Green Power Pvt. Ltd. Adjudication of dispute 09/11/2017
152 1075/17 M/s Energo Engineering Projects Ltd. Adjudication of dispute 09/11/2017
153 - Suo-Motu RERC (Deviation Settlement Mechanism and related matters) Regulations, 2017 08/11/2017
154 1125/17 M/s Dhursar Solar Power Pvt. Ltd. Adjudication of dispute 01/11/2017
155 1255/17 M/s Barmer Power Transmission Service Limited Grant of Transmission Licence 01/11/2017
156 1256/17 M/s Thar Power Transmission Service Limited Grant of Transmission Licence 01/11/2017
157 1258/17 M/s Hadoti Power Transmission Service Limited Grant of Transmission Licence 01/11/2017
158 1101/17 M/s BSL Ltd. Adjudication of dispute 13/10/2017
159 1254/17 M/s Thar Power Transmission Service Ltd. Adoption of transmission charges 26/09/2017
160 1253/17 M/s Barmer Power Transmission Service Ltd. Adoption of transmission charges 26/09/2017
161 1257/17 M/s Hadoti Power Transmission Service Ltd. Adoption of transmission charges 26/09/2017
162 1098/17 M/s Suryaa Chamball Power Ltd. For allowing transmission losses suffered due to non-shifting of meter 26/09/2017
163 1036/17 M/s Sagar Powertex Pvt. Ltd. Adjudication of dispute 26/09/2017
164 1021/17 M/s Jindal Saw Ltd. Review of Commission’s Order dated 01.12.2016 26/09/2017
165 838/16 M/s Mangalam Cement Ltd. Adjudication of dispute 26/09/2017
166 964/16 M/s Bindu Vayu Urja Pvt. Ltd. Adjudication of dispute 14/09/2017
167 1099/17 RVUN In-principal approval of additional capitalization RGTPS Stage I and II (110 MW) 14/09/2017
168 - Suo-Motu RERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2017. 14/09/2017
169 1251/17 M/s National Engineering Industries Ltd. Adjudication of dispute 06/09/2017
170 849/16 M/s Maharaja Shree Umaid Mills Ltd. Non-compliance of Commission’s order dt. 20.06.2016 06/09/2017
171 1031/17 1075/17 M/s Arjun Green Power Pvt. Ltd. M/s Energo Engineering Projects Ltd. Application filed by Respondent to implead Discoms as necessary and proper party. 06/09/2017
172 - Suo-Motu Corrigendum in RERC ( Electricity Supply Code and Connected Matters) (Eleventh Amendment) Regulations, 2017 30/08/2017
173 1236/17 M/s National Engineering Industries Ltd. Adjudication of dispute 11/08/2017
174 - Suo-Motu RERC (Electricity Supply Code and Connected Matters) (Eleventh Amendment) Regulations, 2017 09/08/2017
175 1107-1112, 1117-1122, 1128, 1131-1142, 1177-1179, 1190-1194, 1216-1219, 1226-1234/17 M/s Link Enterprises and others Adjudication of Dispute (LPS) 03/08/2017
176 1083-1088, 1092-1097, 1115-1116, 1129, 1143-1162, 1180-1189, 1198-1211, 1213-1215, 1225, 1237-1238/17 M/s Sharma Industries and others Non compliance of Commission’s order 03/08/2017
177 745/16 M/s Progressive and Popular Minerals Pvt. Ltd. Adjudication of dispute 01/08/2017
178 597/16 National Solar Energy Federation of India Petition filed under Section 61, 62 and 86 (1) (a), (c), (e) of Electricity Act, 2003 01/08/2017
179 493/14 M/s Adani Power Rajasthan Ltd. I.A. No.7 of 2017 for seeking direction to Respondents to pay compensation for Clean Energy Cess as Change in Law as approved in order dt. 29.12.2015. 17/07/2017
180 1130/17 M/s Kripa Steels Industries Adjudication of dispute under Regulation 30 and 31 of the Open Access Regulations, 2016 11/07/2017
181 878/16 M/s Ultratech Cement Limited Adjudication of dispute under Regulation 30 of Open Access Regulations, 2016. 13/06/2017
182 869/16 M/s Premier Bars Pvt. Ltd. Non-compliance of Ombudsman’s order dt. 30.06.2016 08/06/2017
183 925/16 M/s Adinath Sortex Non-compliance of Ombudsman’s order dt.16.08.2016. 08/06/2017
184 1011/16 M/s SKM Products Non compliance of the Ombudsman order dt. 20.09.2016 08/06/2017
185 482/14 M/s Shree Cement Ltd. U/s 142 of the Electricity Act, 2003 for non-compliance of ABT Regulations and CPP Regulations 08/06/2017
186 920/16 M/s Adani Power Rajasthan Ltd. Seeking compensation/tariff adjustment under Section 86 of the Electricity Act read with Article 10 and 14 of the PPA 08/06/2017
187 - Suo-Motu Power Purchase Regulations, 2016 (Fourth Amendment), RPO Regulations, 2016 (Fourth Amendment) and REC Regulations, 2016 (Second Amendment) 07/06/2017
188 1020/17 M/s Ultratech Cement Ltd. For removal of difficulties under Regulation 15 of RPO Regulations, 2010 25/05/2017
189 1057-1058/17 and 1061/17 M/s RSWM Ltd. and Ors. Aggrieved with notice of Discoms regarding recovery of alleged RPO dues. 25/05/2017
190 550/15 Wind Independent Power Producers Association Seeking directions for compliance of RPO imposed upon the obligated entities in the State 15/05/2017
191 837/16 Green Energy Association Petition filed under Sections 142 and 146 of the Electricity Act, 2003 for non-compliance of Solar RPOs for the FY 2011-12 to FY 2014-15 by the obligated entities. 04/05/2017
192 1123/17 Discoms Amendment in RERC (Supply Code and Connected Matters) Regulations, 2004 03/05/2017
193 1089/17 RVUN Amendment in normative Station Heat Rate of Chhabra Thermal Power Station Stage-1 (Unit 1 to 4) 24/04/2017
194 1102/17 M/s Mytrah Vayu (Som) Pvt. Ltd. Arbitrary and unlawful delay in executing the PPA and applicability of Generic Tariff Order for Wind Power Plants 19/04/2017
195 1090/17 M/s Tirupati Fibres and Industries Ltd. Petition filed under Section 56(1) and 142 of the Act and Regulation 30 and 31 of Open Access Regulations, 2016 17/04/2017
196 960/16 M/s Adani Transmission (Rajasthan) Ltd. Approval under Section 17 (3) and (4) of the Electricity Act,2003 11/04/2017
197 839/16 840/16 RREC seeking directions against the defaulting obligated entities for the shortfall in meeting the RPO 23/03/2017
198 877/16 M/s Jindal Saw Ltd. Review of Commission’s Order dt. 24.08.2016. 09/03/2017
199 891/16 to 918/16, 921/16 and 922/16 M/s RSWM Ltd. and Ors. Review of Commission order dt. 24.08.2016 21/02/2017
200 870-875, 880-888, 926-927, 933-957, 971-980, 1008-1009 1025-1030, 1054-1056, 1062-1066 M/s Markdata Power and Energy Ltd. and Ors. Adjudication of Dispute (LPS) 15/02/2017
201 859- 866, 930-932, 961-963, 981- 984, 994-998, 1012-1019/16, 1022-1024, 1032-1034,1037-1053, 1067-1074, 1081/17 M/s J.N. Investments and Trading Co, Pvt. Ltd. and Ors. Non-Compliance of Commission’s Order 15/02/2017
202 1090/17 M/s Tirupati Fibres and Industries Ltd. Petition filed under Section 56 (1) and 142 of the Electricity Act, 2003 read with Regulation 30/31 of the RERC Open Access Regulations, 2016 09/02/2017
203 493/14 M/s Adani Power Rajasthan Ltd. IA No 2 for seeking clarification of the order dated 29.12.2015 20/01/2017
204 919/16 Tirupati Fibers and Industries Adjudication of dispute 12/01/2017
205 627/16 Shri Ram Pistons and Rings Ltd. Non compliance of ombudsman order 12/01/2017
206 968/16 to 970/16, 985/16 1006/16 M/s Birla Corporation Ltd. and Ors. Removal of difficulties under RPO Regulations 27/12/2016
207 1003-16 to 1005/16 1010/16 M/s J K Lakshmi Cement Ltd. and Ors. Petitions filed under Section 86 (1) (e) and 142 of the Act 27/12/2016
208 478/14 Discoms Adjudication of dispute 14/12/2016
209 502/15 M/s National Energy Trading and Services Ltd. Review of Commission’s order dt. 24.01.2014 14/12/2016
210 603/16 M/s DCM Shriram Limited Petition filed under Section 86(1) (a), (k) and 50 of the Electricity Act, 2003 13/12/2016
211 604/16 848/16 868/16 M/s Shree Krishna Rolling Mills and others Seeking clarification regarding levying of wheeling charges 13/12/2016
212 567/15 568/15 M/s Suzlon Energy Ltd. Petitions filed under Section 86(1)(b), (e) and (f) of the Electricity Act, 2003 06/12/2016
213 601/16 Adani Power Rajasthan Ltd. Adjudication of Dispute 24/11/2016
214 - Suo-Motu Truing-up Formats for Distribution Licensee 02/11/2016
215 596/16 U. P. Ceramics and Potteries Ltd. Adjudication of Dispute 20/09/2016
216 733/16 to 743, 746 to 758, 762 to 785, 800 to 811, 818 to 836, 841 to 846, 850 to 858/16 M/s Swapnali Bhosale (Wind Mill Farm) and others Adjudication of Dispute (LPS) 19/09/2016
217 658/16 M/s J K Lakshmi Cement Ltd. Non-compliance of Ombudsman Order dt. 01.03.2016. 08/09/2016
218 744/16 M/s Adani Transmission (Rajasthan) Ltd. Grant of Transmission License for 400 kV D/C Suratgarh-Bikaner line. 30/08/2016
219 759/16 M/s Mangalam Cement Ltd. Adjudication of dispute 11/08/2016
220 587/15 RSEB Engineers’ Association Non-compliance by Discoms of condition 9 of the licence 04/08/2016
221 644/16 645/16 World Renewal Spiritual Trust Non-compliance of Ombudsman Order dt. 14.01.2016. 04/08/2016
222 646/16 647/16 M/s Global Hospital and Research Centre Non-compliance of Ombudsman Order dt. 14.01.2016. 04/08/2016
223 536/15 Discoms Determination of wheeling and Cross subsidy surcharge for FY 2015-16 28/07/2016
224 480/14 M/s Phulera Granite Impex Non- compliance of Ombudsman’s order dt. 02.06.14 28/07/2016
225 602/16 M/s Hindustan Zinc Ltd. challenging the direction issued by RREC for RPO compliance 28/07/2016
226 542/15 M/s Stoneage Pvt. Ltd. Petition under Section 142 of the Electricity Act 06/07/2016
227 556/15 M/s Suryaa Chamball Power Ltd. Adjudication of dispute 04/07/2016
228 624/16 M/s KEC Bikaner-Sikar Transmission Pvt. Ltd. Approval under Section 17 of the Electricity Act, 2003 04/07/2016
229 761/16 M/s Adani Power Rajasthan Ltd. Adjudication of dispute 30/06/2016
230 523/15 RWPL Adjudication of dispute 29/06/2016
231 561/15 M/s Kishangarh Hi-Tech Textile Park Ltd. Adjudication of dispute 22/06/2016
232 576/15 M/s Maharaja Shree Umaid Mills Ltd. Adjudication of dispute 20/06/2016
233 702/16 M/s Shekhawati Transmission Service Co. Ltd. Approval under Section 17 of the Electricity Act, 2003 20/06/2016
234 551/15 National Engineering Industries Dispute regarding unutilized energy under Open Access Regulations 16/06/2016
235 598-600/16,605/16,610-623/16,628-643/16 649-651/16,653-657/16,659-699/16,703-732/16 M/s KRBL Ltd.and Anr. Adjudication of dispute 14/06/2016
236 472/14 Central Academy Non compliance of Ombudsman’s order 01.05.2014 09/06/2016
237 700/16 M /s REI Power Bazaar Pvt. Ltd. Seeking permission for setting up Intra-state power market in Rajasthan 24/05/2016
238 - Suo-Motu Approval of Procedure for grant of Open Access 18/05/2016
239 570- 574, 578, 580, 588/15 M/s Arvind Construction Co (P) Ltd. and others, Adjudication of dispute 28/03/2016
240 591/16 M/s Energo Engineering Projects Ltd. Adjudication of dispute 16/03/2016
241 577/15 M/s Adani Power Rajasthan Ltd. Adjudication of dispute 15/03/2016
242 586/15 M/s Arjun Green Power Pvt. Ltd. Adjudication of dispute 15/03/2016
243 503/15 M/s Ramayana Ispat Pvt. Ltd. Non settlement of UI account 09/03/2016
244 581/15 M/s KEC Bikaner-Sikar Transmission Pvt. Ltd. Grant of Transmission License for 400 kV D/C Bikaner-Sikar line. 04/03/2016
245 575/15 M/s Shri Maheshwari Pvt. Industrial Training Institute Non-compliance of the Ombudsman’s order dt. 05.02.2015 24/02/2016
246 589/16 M/s Ginni International Ltd. Clarifications on applicability of 3.8% losses on interstate open acess 12/02/2016
247 - Suo-Motu Truing-up Formats for Transmission Companies 11/02/2016
248 496/14 Rajwest Power Ltd. Adjudication of dispute 05/02/2016
249 558/15 Nikhar Minerals Non-compliance of the Ombudsman’s order dt. 05.06.2015 04/02/2016
250 560/15 M/s R.M. Mittal Steels Pvt. Ltd. Clarifications on applicability of 3.8% losses on interstate open acess 29/01/2016
251 585/15 M.s National Engineering Industries Ltd. Review of Commission’s Order dated 24.11.2015 29/01/2016
252 582/15 Discoms Review of Commission’s Order dt. 07.10.2015 27/01/2016
253 - Suo-Motu Truing-up Formats for Generating Companies 25/01/2016
254 564/15 M/s Sun Minerals Non-compliance of the Ombudsman’s order dt. 04.03.2013 21/01/2016
255 559/15 M/s balaji Milk Ice Cream and Ice Non-compliance of the Ombudsman’s order dt. 24.06.2015 21/01/2016
256 - Suo-Motu Statement of objects and reasons on second amendment in SOP Transmission Regulations, 2004. 11/01/2016
257 493/14 M/s Adani Power Rajasthan Ltd. I.A. 1 of 2015 29/12/2015
258 466/14 and 501/15 M/s MTSCL and ATSCL Adjudication of dispute 28/12/2015
259 521/15 M/s Hindusthan Urban Infrastructure Ltd. Adjudication of dispute 28/12/2015
260 522/15 M/s ISC Projects Pvt. Ltd. Adjudication of dispute 28/12/2015
261 524/15 M/s Jaisalmer Marbles Pvt. Ltd. Adjudication of dispute 28/12/2015
262 525/15 M/s Essgee Real Estate Developers Pvt. Ltd. Adjudication of dispute 28/12/2015
263 526/15 M/s Essgee Real Estate Developers Pvt. Ltd. Adjudication of dispute 28/12/2015
264 527/15 M/s Arora Textiles Pvt. Ltd. Adjudication of dispute 28/12/2015
265 528/15 M/s Raj Trans Stampings(P) Ltd. Adjudication of dispute 28/12/2015
266 529/15 M/s Rahul Dravid Adjudication of dispute 28/12/2015
267 530/15 Orange Renewable Power Pvt. Ltd. Adjudication of dispute 28/12/2015
268 531/15 Orange Jaisalmer Wind Energy Pvt. Ltd. Adjudication of dispute 28/12/2015
269 532/15 Chemical and Mineral Industries Pvt. Ltd. Adjudication of dispute 28/12/2015
270 533/15 M/s Malaxmi Wind Power Adjudication of dispute 28/12/2015
271 538/15 M/s Bhabani Pigments Pvt. Ltd. Adjudication of dispute 28/12/2015
272 539/15 M/s Miraj Products Pvt. Ltd. Adjudication of dispute 28/12/2015
273 543/15 Sh. Madan Lal Paliwal Adjudication of dispute 28/12/2015
274 544/15 M/s JLC Electromet Pvt. Ltd. Adjudication of dispute 28/12/2015
275 545/15 Rishi Kiran Logistics Pvt. Ltd. Adjudication of dispute 28/12/2015
276 546/15 Rishi Kiran Logistics Pvt. Ltd. Adjudication of dispute 28/12/2015
277 547/15 M/s Maxwell Inc. Adjudication of dispute 28/12/2015
278 549/15 Mukand Industries Pvt. Ltd. Adjudication of dispute 28/12/2015
279 540/15 M/s Gaurav Package Non-compliance of the Ombudsman’s order dt. 31.10.2014 04/12/2015
280 482/14 M/s Shree Cement Limited Non compliance of RERC (Intra-State ABT) Regulations, 2006 04/12/2015
281 519/15 M/s Oswal Cables Pvt. Ltd. Adjudication of dispute 04/12/2015
282 520/15 M/s Advance Metering Technology Ltd. Adjudication of dispute 04/12/2015
283 583/15 Discoms extension of implementation of Domestic Efficient Lighting Programme (DELP) 03/12/2015
284 565/15 Discoms Seeking relaxation in 10% cap on fuel surcharge under Tariff Regulations, 2014 03/12/2015
285 565/15 Discoms Seeking relaxation in 10% cap on fuel surcharge under Tariff Regulations, 2014 02/12/2015
286 515/15 M/s Centaur Mercantile Pvt. Ltd. Adjudication of dispute 02/12/2015
287 516/15 M/s Jajoo Exports Adjudication of dispute 02/12/2015
288 518/15 M/s Punit Construction Company Adjudication of dispute 02/12/2015
289 562/15 RVPN Approval of Unitary Charges for Suratgarh TPS – Bikaner Transmission Line Project 27/11/2015
290 566/15 RVPN approval of Unitary Charges for Babai-Jaipur (North) Transmission Line Project 27/11/2015
291 506/15 M/s Sterling Agro Indistries Ltd. Adjudication of dispute 27/11/2015
292 507/15 M/s Varroc Engineering Pvt. Ltd. Adjudication of dispute 27/11/2015
293 510/15 M/s Sun and Sand Hotels Pvt. Ltd. Adjudication of dispute 27/11/2015
294 511/15 M/s Rajendra Exim Pvt. Ltd. Adjudication of dispute 27/11/2015
295 512/15 M/s Devki Builders Pvt. Ltd. Adjudication of dispute 27/11/2015
296 513/15 M/s National Engineering Industries Ltd. Adjudication of dispute 27/11/2015
297 514/15 M/s Toyop Relief Pvt. Ltd. Adjudication of dispute 27/11/2015
298 509/15 M/s National Engineering Industries Ltd. Adjudication of dispute for deduction of loss from energy drawn under Open Access 24/11/2015
299 490/14 M/s Sarayu Investment Pvt. Ltd. Adjudication of dispute 23/11/2015
300 489/14 M/s Vitesse Pvt. Ltd. Adjudication of dispute 23/11/2015
301 494/14 M/s Shree Cement Ltd. Adjudication of dispute 23/11/2015
302 495/14 Smt. Manju Sanghi Adjudication of dispute 23/11/2015
303 504/15 M/s Salva Twisters Pvt. Ltd. Adjudication of dispute 23/11/2015
304 563/15 M/s ACC Ltd. Adjudication of dispute 17/11/2015
305 569/15 Indian Biomass Power Association for appropriate amendment in order to ensure viability of the biomass power plants in the State of Rajasthan 17/11/2015
306 541/15 M/s Vishal Super Power Industries non-compliance of Commission’s orders dated 03.03.2015 05/11/2015
307 508/15 Discoms relaxation/amendment in 5% rebate and time period specified Supply Code Regulations 09/10/2015
308 555/15 RVPN Adoption of tariff for 400 kV D/C Bikaner-Sikar Transmission Line Project through PPP mode availing VGF. 09/10/2015
309 497/14 Kishangarh Hi-Tech Textile Park Ltd. Adjudication of dispute 07/10/2015
310 523/15 RWPL Adjudication of dispute 07/10/2015
311 557/15 Discoms Amendment in RERC (Terms and Conditions for Determination of Tariff) Regulations, 2014 07/10/2015
312 500/15 The Rajasthan Solar Association Determination of promotional Transmission Charges and Losses for transmission of Solar Power. 14/08/2015
313 392/13 M/s Adani Power Rajasthan Ltd. I.A. No. 3 06/08/2015
314 534/15 M/s Adani Power Rajasthan Ltd. Non compliance of Commission’s order dt. 30.05.2014 06/08/2015
315 - Suo-Motu Clarification regarding tariff provisions for Roof top solar power plants 24/07/2015
316 431/13 RVPN Adoption of tariff regarding procurement of 1000 MW power through case-I bidding 22/07/2015
317 436/14 Chandelao Vikas Sansthan Petition filed under Section 86 (1) (b) of the Act for cancellation of the LOI and PPAs 22/07/2015
318 - Suo-Motu Difficulties faced by Discoms in implementing Net metering Regulations,2015 30/06/2015
319 - Suo-Motu Order on Tariff Regulations, 2015 for Biomass, Biogas and Biomass Gasifier Energy. 07/05/2015
320 466/14 M/s. Maru Transmission Service Company Ltd. I.A. No.1 of 2015 01/05/2015
321 474/14 M/s Kalani Industries Pvt. Ltd. Adjudication of dispute 01/05/2015
322 493/14 M/s Adani Power Rajasthan Ltd. determination the compensation/tariff adjustment 29/04/2015
323 475/14 Shree Cement Ltd. Adjudication of dispute 10/04/2015
324 476/14 M/s DCM Shriram Ltd. Adjudication of dispute 10/04/2015
325 505/14 Discoms Approval of implementation of DELP by distribution of LED bulbs 20/03/2015
326 IA 2 of 392/13 Adani Power Rajasthan Limited Adjudication of dispute 18/03/2015
327 461/14 M/s Maru Transmission Service Company Ltd. Adjudication of dispute 22/01/2015
328 431/13 RVPN adoption of tariff and approval of deviation regarding procurement of 1000 MW power through case-I bidding. 09/01/2015
329 498/14 RVPN review of Commission’s order dt. 08.12.2014. 09/01/2015
330 473/14 RVPN approval of Unitary Charges for initiating the bidding process for the Project through PPP Mode availing VGF. 08/12/2014
331 422/13 M/s HZL Adjudication of dispute 26/11/2014
332 465/14 M/s Balkrishna Industries Ltd, Review of Commission order dt. 29.05.2014 14/11/2014
333 421/13 M/s HZL Adjudication of dispute 11/11/2014
334 425/13 M/s HZL Adjudication of dispute 11/11/2014
335 245/11 BLMCL Approval of draft tender document for selection of MDO 31/10/2014
336 434/14 Sathyam Green Power Pvt. Ltd. Adjudication of dispute 31/10/2014
337 349/12 M/s Shree Cement Ltd. Removal of difficulty-Segregation of solar component 18/09/2014
338 245/11 BLMCL Approval of draft tender document for selection of MDO 02/09/2014
339 440/14 Shrenik Marble Pvt. Ltd Adjudication of dispute 23/07/2014
340 441/14 Navbharat Buildcon Pvt. Ltd Adjudication of dispute 23/07/2014
341 443/14 Hindustan Zinc Ltd. Adjudication of dispute 15/07/2014
342 392/13 Adani Power Rajasthan Ltd Adjudication of dispute 25/06/2014
343 435/14 V. S. Lignite Power Private Ltd Adjudication of dispute 18/06/2014
344 430/13 Green Infra Wind Farm Adjudication of dispute 17/06/2014
345 - Suo-Motu Order on Renewable Energy Obligation Regulation 2nd Amendment 30/05/2014
346 392/13 Adani Power Rajasthan Ltd Adjudication of dispute 30/05/2014
347 253/11 RVPN determination of losses 29/05/2014
348 405/13 Shri Rajendra Kumar Mehta compensation for loss in wheat crop 29/05/2014
349 375/13 M/s. Balkrishna Industries Ltd. non-compliance of Commission’s orders dated 25.7.06 29/05/2014
350 448/14 RVUN Review of Commission’s Order dated 24.2.2014 29/05/2014
351 449/14 M/s Transtech Green Power Private Ltd. Review of Commission’s Order dated 21.2.2014 29/05/2014
352 415/13 M/s Dangayach Hotels Pvt. Ltd. Adjudication of dispute 08/05/2014
353 431/13 Chandelao Vikas Sansthan Interlocutory Application 08/05/2014
354 -- Suo-Motu Formats for filling tariff petitions 07/04/2014
355 363/12 M/s PTC Adjudication of dispute 25/02/2014
356 --- Suo-Motu MYT Wind and Solar reg 2014 24/02/2014
357 --- Suo-Motu Seventh Amendment in tariff regulations 24/02/2014
358 --- Suo-Motu RERC MYT tariff regulations 24/02/2014
359 385/13 M/s Transtech Green Power Pvt. Ltd. Adjudication of dispute 21/02/2014
360 -- Suo-Motu Memo on RERC (Power Purchase and Procurement Process of Distribution Licensee) (3rd Amendment) Regulations, 2014 20/02/2014
361 -- Suo-Motu Memo on SoP Regulations of Distribution Licensee, 2012 17/02/2014
362 414/13 M/s Transtech Green Power Pvt. Ltd. and others for viability of the biomass power plants in the State of Rajasthan 10/02/2014
363 392/13 (IA) Adani Power Rajasthan Ltd Adjudication of dispute 30/01/2014
364 348/12 two thousand farmers review of order dt.24.08.2012 28/01/2014
365 393/13 V.S. Lignite Adjudication of dispute 24/01/2014
366 244/11 RWPL Application filed by RWPL 13/01/2014
367 244/11 RWPL Application filed by Discoms and Samta Power 13/01/2014
368 321/12 Two thousand farmers compensation for deficient power supply 10/01/2014
369 417/13 JVVNL Review of order dated 10.07.13 02/12/2013
370 375/13 Balkrishna Industries Ltd Adjudication of dispute 28/11/2013
371 359/12 S. M. Environmental Technologies Pvt. Ltd. Adjudication of dispute 27/11/2013
372 380/13 Navbharat Buildcon Adjudication of dispute 12/11/2013
373 --- Suo-Motu Fee for petition seventh Amend 11/11/2013
374 329/13 Shree Cement Ltd. Adjudication of dispute 29/10/2013
375 -- Suo-Motu Third Amendment in transaction of Business regulations 28/10/2013
376 418/13 RVPN Allocation and apportionment of losses in solar plants 17/10/2013
377 376/13 Shekhawati Transmission Service Company Limited Grant of Transmission Licence 08/10/2013
378 404/13 Sanjog Sugars Determination of preferential tariff 27/09/2013
379 366/13 Discoms Determination of Wheeling Charges and Losses for FY 2013-14 18/09/2013
380 377/13 Shekhawati Transmission Service Co. Ltd. Adoption of transmission Tariff 27/08/2013
381 403, 408 to 412 Cooper Foundry and others Adjudication of dispute 21/08/2013
382 416/13 JVVNL Review of order dt. 06.06.13 19/08/2013
383 384/13 RVPN Review of order dt.28.12.12 14/08/2013
384 362/13 Transtech Green Power and S.M. Environmental Adjudication of dispute 05/08/2013
385 398 to 402,407/13 Lovely Fragrances and others Adjudication of dispute 02/08/2013
386 -- Suo-Motu Tenth Amendment in Electricity Supply Code 01/08/2013
387 351/12 Sh. R. Jhalani issuance of unlawful orders by Jaipur Discom 29/07/2013
388 343/12 Akhil Bhartiya Kisan Sabha Excess levy of charges 10/07/2013
389 392/13 Adani Power Rajasthan Ltd. Petition under S. 61, 63 and 86 05/07/2013
390 -- Suo-Motu Memo onService reg. third amendment 04/07/2013
391 333/12 RVPN Amendment in Tariff regulations 25/06/2013
392 396/13 RVPN Approval of deviation in bid process 25/06/2013
393 355/12 Association of Power Producers Amendment in Open Access 21/06/2013
394 372/13 Sh.R.G.Gupta Non compliance of Act and regulations 13/06/2013
395 371/13 RREC Tariff for Biogas based plants 31/05/2013
396 -- Suo-Motu Memo on RERC (tariff regulations) (6th Amendment) Regulations, 2013 31/05/2013
397 334/12 Discoms Amendment in supply code 24/05/2013
398 367, 368,369/13 APM, Balakrishna, Nahar Industries Adjudication of dispute 24/05/2013
399 379/13 J.K. Lakshmi Cement Ltd., Sirohi Review of order dated 08.02.13 10/05/2013
400 - Suo-Motu RERC (Metering) (1st Amendment) Regulations, 2013 10/05/2013
401 381/13 Gura Thermal Power Co. Approval of deviation in bid process 02/05/2013
402 330/12 RVUN Review of order dt. 10.05.12 22/04/2013
403 37812 RVPN Approval for single bidder 15/04/2013
404 350/12 Discoms Review of order dt. 17.8.12 on meter cost 08/04/2013
405 360/12 RREC Grant of trading Licence 25/03/2013
406 360/12 RREC Grant of trading Licence 15/03/2013
407 365/13 RVPN Approval of deviation in bid process 04/03/2013
408 361/12 Vishal Exports Overseas Ltd Adjudication of dispute 01/03/2013
409 320/12 J.K. Lakshmi Cement Ltd., Non-compliance of Act 08/02/2013
410 339/12 Transtech Green Power Pvt.Ltd Removal of difficulties in RERC regulations 11/01/2013
411 350/12 Discoms Review of order dt. 17.8.12 - Admissibility 28/12/2012
412 251/11 Shree Cement Ltd. Adjudication of dispute 28/12/2012
413 344/12 345/12 MTSCL ATSCL Approval under section 17 of Act 24/12/2012
414 347/12 Sh. R. Jhalani Vs. GoR constitution of a lawful appellant authority under Section-127 (1 12/12/2012
415 319/12 and 332/12 Tata Tele Services and Bharti Hexacom Ltd Non- compliance of Commission’s order dt. 08.09.2011 11/12/2012
416 318,326, 327/12 RREC, Kalani and RSMML Adjudication of dispute 10/12/2012
417 302/12 303/12 and 305/12 JVVNL AVVNL Jd. VVNL Approval of Investment Plan FY13 30/11/2012
418 337/12 Rajasthan Biomass Power Developers Association Removal of difficulties in Tariff regulations 08/11/2012
419 300/12 RVPN Approval of Investment Plan FY13 25/10/2012